23/03/2020 Coronavirus halts progress until it’s over. 14/07/2020 Now that things have stabilised into the New Normal hopefully can get back into this Truck. To do list:- 1.Finish spraying the inside of the Cab. 2 Fit most of the electrics and Gauges to the Dashboard. 3 Replace the Cab to the Frame 20/07/2020 Stated workContinue reading “1941 Blog”
Author Archives: plymouth125
Posted byplymouth125February 8, 2020Posted inUncategorizedEditIntroduction